November EC Meeting 2019
Item Number
Headline
Item
Description
Timing
Hotel Cost
GFTU Cost
Cap Ex
Comments
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
1 Staffing
Salaries
Site manager
Ongoing Ongoing Ongoing Ongoing One-off One-off One-off One-off One-off One-off One-off One-off One-off One-off One-off One-off One-off Annual Annual Annual Ongoing One-off Ongoing One-off Annual Annual Annual One-off Ongoing Ongoing
2 3 4 5
Maintenance technician
Apprentice
Hotel Porter
Hotel porter
Workwear
£ 200.00 £ -
£ 200.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
6
Work wear for Site team
Footwear, Fleeces, Polo shirts, Trousers
£ 400.00 £ -
£ 200.00 £ - £ - £ - £ - £ - £ - £ - £ 200.00 £ - £ - £ -
7
Personal Protective Equipment (PPE) for Site team
Hi-Vis, Safety goggles, Hard hats, Gloves
£ - £ - £ - £ - £ 200.00 £ - £ - £ - £ - £ - £ - £ - £ 200.00 £ -
8 Tools and Machinery
Hand tools
Milwaaukee Twin Blade
9
Weed kiler
£ 100.00 £ - £ 280.00 £ - £ 350.00 £ - £ 50.00 £ - £ 280.00 £ - £ 275.00 £ - £ 200.00 £ - £ 240.00 £ - £ 125.00 £ - £ 240.00 £ -
£ - £ - £ 50.00 £ - £ - £ - £ - £ - £ - £ 50.00 £ - £ -
10 11 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
Jigsaw
£ 280.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Hand drill
£ 350.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Power tools
Portable transformer
£ 50.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Fuel angle grinder With Battery
£ 280.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Jigsaw With Battery
£ 275.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Circular Saw With Battery
£ 200.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Chainsaw 16" Rotary Hammer
£ 240.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ 125.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ 240.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Jet washer
Neil to speak with James L to obtain full equipment list and costs
19 Planned routine maintenance/servicing
Kitchen equipment repairs and maintenance cost
Kitchen equipment Replacement cost
ADT for Fire alarm servicing cost
£ 125.00 £ 125.00 £ - £ 250.00 £ 250.00 £ -
£ - £ - £ 250.00 £ - £ - £ - £ - £ - £ - £ - £ - £ -
Intruder alarm servicing cost
£ - £ - £ 250.00 £ - £ - £ - £ - £ - £ - £ - £ - £ -
Disabled access Audit
£ - £ - £ 250.00 £ - £ - £ - £ - £ - £ - £ - £ - £ -
Wheelchair lift
Cost to service and repair
Neil to obtain quote from Schindler
Cost to replace
Guest lift to first floor
Cost to service and repair
Cost to replace
Fire risk assessments Fire alarm servicing Gas fire in Panel room
Done by Paul Mcann, Red fire and safety
£ 400.00 £ 400.00 £ 1,500.00 £ 500.00
£ - £ 800.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
TYCO
£ - £ 2,000.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Cost to service and repair
Cost to replace
Nottingham Pest control
Monthly DD
Tractor servicing
Cost to service and repair
Annual Annual Ongoing
PAT Testing
CCTV Maintenance
Cost to service and repair
Will require further maintenance work in the winter and spring
Roads and car parks
Ongoing
Gym equipment servicing and repair cost
All machines service fixed cost Parts and repairs (If required) Locksmith account with Russells
Annual
£ 400.00 £ - £ 1,500.00 £ -
£ - £ 400.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Ongoing
£ - £ 1,500.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
39 Health and safety costs and interventions
Locksmith services
As required
£ 750.00
£ 750.00
£ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Management review of Health and Safety arrangements across site
40
Ongoing
Peninsula or Kroner HR Platform, Health and Safety Audit function
41
Ongoing
Signage required for each first aid kit (Includes refills)
42
First Aid kit
Ongoing One-off One-off One-off
£ 350.00 £ 50.00
£ - £ - £ - £ 400.00 £ - £ - £ - £ - £ - £ - £ - £ -
43 Security costs and interventions
Intruder alarm for GFTU
Purchase and Installation cost Purchase and Installation cost
44 45
CCTV Installation for GFTU and Hotel
Door swipe cards on GFTU doors
Front and back door
£ - £ 500.00
£ 500.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Repairs to the water feature in the Romantic Garden - Becoming harzadous - bricks are unstable - Creating risk of falling in and drowning for children. Restoration of terrace and planters on terrace by boardroom.
46 Development projects
Restoration and renewal of exisiting initiatives
As required
£ 10,000.00 £ - £ 10,000.00
£ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
47
Planting
Seasonal
£ 400.00 £ -
£ - £ - £ - £ 200.00 £ - £ - £ - £ - £ - £ 200.00 £ - £ -
tree stakes and ties etc
48
Ongoing
£ 300.00 £ -
£ - £ - £ - £ 300.00 £ - £ - £ - £ - £ - £ - £ - £ -
For males, females and people of disability and any changes should incorporate baby changing facilities in all three
49
Need for additional public toilets
Restoration and decoration of the Disabled toilets by reception (more urgent). Restoration and decoration of the Male and female toilets by reception. Refurbish and decorate gym toilets and showers
50
One-off
£ 300.00 £ -
£ - £ - £ 300.00 £ - £ - £ - £ - £ - £ - £ - £ - £ -
51 52 53 54 55
One-off One-off
£ 500.00 £ - £ 2,500.00 £ -
£ - £ - £ 500.00 £ - £ - £ - £ - £ - £ - £ - £ - £ -
£ - £ - £ 2,500.00 £ - £ - £ - £ - £ - £ - £ - £ - £ -
Bar in the new extension Racking in the store rooms
One-off Ongoing
Urgent reroofing of the older section of the Hotel
Jarvis Roofing
£ 70,000.00 £ - £ 70,000.00
£ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Link this to a quote for external painting. Boiler house doors may need replacing and painting. Lounge and panel room broken windows to be fixed
Replacement doors and windows where they are failing Restaurant refurbishment, bi fold doors into garden and creation of a terrace for eating outdoors, barbecues, drinks receptions. Install a screen between the romantic garden and the road
56
Ongoing
£ 15,000.00 £ - £ 15,000.00
£ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
57
Ongoing
£ 50,000.00 £ - £ 50,000.00
£ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
58
For privacy and safety
£ 350.00 £ -
£ 350.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
By the Gazebo for a small PA system, lighting and outdoor fridge etc
59 60 61
Additional power sockets Gravel for compound
£ 650.00 £ - £ 300.00 £ - £ 500.00 £ -
Waiting on quotes
£ - £ 650.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Gravel
£ - £ 300.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Drop kerb for compound
£ - £ 500.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Made with FlippingBook Online newsletter