November EC Meeting 2019
62
Level out the pathway outside of the restaurant
Replace stone paving to help with Disable The rendering of outside the building needs quite urgent attention once the roofin has been done
Ongoing
£ 35,000.00 £ - £ 35,000.00
£ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
63 Fabric of the building
Rendering
Ongoing One-off Ongoing Ongoing
£ 30,000.00 £ - £ 30,000.00
£ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
64 65 66 67 68 69 70 71
Replaster restaurant ceiling Decorating older bedrooms
£ 2,000.00 £ -
£ 2,000.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
£ - £ - £ 20,000.00 £ 10,000.00 £ - £ 10,000.00
£ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Decorating public spaces
£ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Restoration of Fire exits from roof
Replacement coolers for air conditioning and in cellar.
Restoration of woodwork in Panel room.
£ 2,500.00 £ -
£ - £ - £ - £ - £ - £ - £ - £ - £ - £ 2,500.00 £ - £ -
Smoking Shelter
Hotel and GFTU (x2)
£ 1,400.00 £ -
£ - £ - £ - £ 1,400.00 £ - £ - £ - £ - £ - £ - £ - £ -
We buy a Mirka or Festool decorators sanding machine, as it has a dust extractor built in – ideal for dealing with the wooden dressing table tops that could then be re-varnished. We use a 2 pack varnish for the dressing tables (recommended for bar’s, floors etc.) in either satin or gloss as it will cover up the stains and wear marks on them – Sadolin PV67. We go to Travis Perkins or Jewsons and buy some clear 45 Degree corner protectors for the high wear corridors to prevent the cleaner’s trolleys doing so much damage. That we use a crystal clear adhesive (Hippo Pro-3) to fix the corner protectors, as the paint will be visible through them and look a lot smarter.
72 Decorations
One-off
£ 650.00 £ -
£ - £ - £ - £ 650.00 £ - £ - £ - £ - £ - £ - £ - £ -
73
Ongoing
£ 250.00 £ -
£ - £ - £ - £ 250.00 £ - £ - £ - £ - £ - £ - £ - £ -
74
Form to be signed for account opening
£ 400.00 £ -
£ - £ - £ - £ 400.00 £ - £ - £ - £ - £ - £ - £ - £ -
75
£ 200.00 £ -
£ - £ - £ - £ 200.00 £ - £ - £ - £ - £ - £ - £ - £ -
That we use a Durable Matt such as Dulux Diamond Matt for the high wear areas, as it will last a lot longer.
76
£ 800.00 £ -
£ - £ - £ - £ 800.00 £ - £ - £ - £ - £ - £ - £ - £ -
77 Snagging
Hotel extension Mews Houses
78
The snagging work expected by J Tomlinson in the old Nursery building is still outstanding
79
GFTU Office
Includes cost for Grass seeds and Aggregate
80 Landscaping
Extensive work and planting schemes
£ 55,000.00 £ - £ 55,000.00
£ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Also includes costs associated with the hotels new builds
81 The gardens and ground
£ 8,000.00 £ - £ 15,000.00
£ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
82 Site maintenance teams compound and workshops
Replacement of racking in shipping container New racking Site maintenance team's workshop
£ - £ 2,000.00 £ 500.00 £ - £ 1,800.00 £ -
£ 2,000.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
83
£ 500.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
84 Sub-contracted work
Tree Survey
£ 1,800.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
85 86 87
Tree-work
£ 15,000.00 £ - £ 15,000.00
£ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Skip hire
£ 1,200.00 £ - £ 750.00 £ -
£ 200.00 £ - £ 200.00 £ - £ 200.00 £ - £ 200.00 £ - £ 200.00 £ - £ 200.00 £ -
Plant/Equipment hire
mini-digger etc
£ 750.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
One day per week
88
Gardens in mews houses
£ 800.00 £ 800.00 £ 800.00 £ 800.00 £ 800.00 £ 800.00 £ 800.00 £ 800.00 £ 800.00 £ 800.00 £ 800.00 £ 800.00 £ 9,600.00
Contracted to Michael
89 Small on-going expenses
Fuel purchases and resources needed in an emergency
£ 840.00 £ -
£ 70.00 £ 70.00 £ 70.00 £ 70.00 £ 70.00 £ 70.00 £ 70.00 £ 70.00 £ 70.00 £ 70.00 £ 70.00 £ 70.00
Includes and speed limit signs), (Electric Vehicle) EV charging points, Disclaimer notices
90 Outdoor works
Signage
£ 3,500.00 £ 2,000.00
£ 3,500.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
91
Road markings (Includes repeat speed limit)
On the road at the entrance
£ 2,000.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
3 Required - From ESPO £140 - 400 litres, Hold 19 x 25kg bags each
92 93 94
Install gritting bins on the car park
One-off Annual
£ 420.00 £ - £ 320.00 £ - £ 160.00 £ -
£ 420.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Rock salt stock
Rock Salt from Espo
£ 320.00 £ - £ - £ - £ - £ - £ - £ - £ 320.00 £ - £ - £ -
Rock salt Spread
£ 160.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
4 required - £175 each - Capacity: 60 litres.- From ESPO
95
Additional Dog waste bins
4 Green bins from Espo
One-off
£ 700.00 £ -
£ 700.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Front door, Goodacre, Car park, New back door and old front door (x5) - Black or Silver bins
6 required - £35.61 each Free standing cigarette bin - From Amazon
96
Additional cigarette end bins
One-off
£ 220.00 £ -
£ 220.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
97 Furniture
Replacement of any damaged furniture items
98 Furnishings
Carpets
99
Soft Furnishings
100
GFTU Classroom Furniture
Requires French polishing
Maintenance and replacement - Oil and wood stain required
101 102
Garden Furniture Replace Gazebo
£ 300.00 £ -
Annual
£ 300.00 £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
£ 10,000.00 £ - £ 10,000.00
£ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
103 Contigency fund
Electrical works, Gas works, Plumbing works
£ 25,000.00 £ - £ 25,000.00 £ 377,525.00 £ 3,825.00 £ 360,750.00 £ 16,775.00
£ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ - £ -
Made with FlippingBook Online newsletter